Products & Services

Materials Information

Product Data

Installation Service

Sales & Distribution Networks

 

 

INSTALLATION QUALITY ASSURANCE

The Installation Quality Assurance Plan include routine trial welds at the beginning of the work day, where small samples of liner are welded and tested for shear and peel. Trial welds assist to check and adjust welding equipment heating temperatures, roller pressure and variable speed controls. Once calibrated, the welding commences.

Destructive seam testing involves cutting out a section of the seam and tested on site. The overlapping welded strips are tensioned in opposite directions to observe weld strength or peeling. Random non-destructive vacuum or air channel tests may be conducted on the Double-track fusion welded seams.

 

For our valued Geopoly HDPE geomembrane lining systems customers, we are able to assist in providing support to establish your very own in-house installation team and to offer the full range of Fusion Welding Machines, Extrusion Welding Equipments, Hand Tool Hot Air Blowers and other Accessories.

Geopoly are the Authorized Distributor for DEMTECH thermoplastic welding and testing equipments for the ASEAN and Greater Asian region. For more information, please visit www.demtech.com or kindly contact us.

 

 

Click all images above for larger view

 

 

 

Partners in Lining Solutions