|
INSTALLATION
QUALITY ASSURANCE
The
Installation Quality Assurance Plan include routine trial welds at the
beginning of the work day, where small samples of liner are welded
and tested for shear and peel. Trial welds assist to check and adjust
welding equipment heating temperatures, roller pressure and variable
speed controls. Once calibrated, the welding commences.
Destructive
seam testing involves cutting out a section of the seam and tested on
site. The overlapping welded strips are tensioned in opposite directions
to observe weld strength or peeling. Random non-destructive vacuum or
air channel tests may be conducted on the Double-track fusion welded
seams.
For
our valued Geopoly HDPE geomembrane lining systems customers, we are
able to assist in providing support to establish your very own in-house
installation team and to offer the full range of Fusion Welding Machines,
Extrusion Welding Equipments, Hand Tool Hot Air Blowers and other Accessories.
Geopoly are the Authorized Distributor for DEMTECH thermoplastic welding and testing equipments for the ASEAN and Greater Asian region. For more information, please visit www.demtech.com or kindly contact us.
|